D2.1 : Development of ensemble-variational data assimilation capability and report demonstrating ensemble
uncertainty products (MO, 50 pm) [month 21]. Deliverable Report.
D2.2 : Report of observations and datasets assembled fot the ensemble-based vatiational assimilation (MO 30
pm) [month 24]
D2.3 : Preliminary report with ensemble diagnostics (MO 50 pm) [month 30]
D2.4 : Ensemble diagnostics report and documentation (MO 30 pm) [month 42]
Uncertainties in Regional Reanalyses - Final Report from the Met Office
D2.5 : Report of results and datasets of two physics HARMONIE runs for spread estimation (SMHI 10 pm, MF 2
pm) [month 12]
D2.6 : Preliminary report of the first period of the RA (SMHI 36 pm) [month 30]
D2.7 : HARMONIE reanalysis report of results and dataset (SMHI 25 pm) [month 45]
D2.8 : MESCAN reanalysis dataset and report 1961-present (MF 40 pm) [month 45]
D2.9 : Ensemble surface reanalysis report (MF 10 pm) [month 30]
D2.10 : UERRA-MESA-CL 30-year European cloud fraction dataset and report (SMHI 7 pm) [month 24]
D2.11 : Probabilistic observations will be generated for Kalman Filter ensemble DA and a report will be written
(UB 10 pm) [month 15]. See the Report.
D2.12 : The KF ensemble reanalysis (KFENDA) system will be developed and with a report demonstrating
reanalysis uncertainty capability (UB 20 pm) [month 21]
D2.13 : KFENDA ensemble diagnostics report and documentation (UB 15 pm) [month 45]
D2.14 : RA uncertainty evaluation: EVDA/HARMONIE/KFENDA uncertainty evaluation report (SMHI 4 pm, MO 4
pm, DWD 3 pm, UB 3 pm) [month 45]