D2.1 : Development of ensemble-variational data assimilation capability and report demonstrating ensemble
uncertainty products (MO, 50 pm) [month 21]. Deliverable Report.
D2.2 : Report of observations and datasets assembled fot the ensemble-based vatiational assimilation (MO 30
pm) [month 24]
D2.3 : Preliminary report with ensemble diagnostics (MO 50 pm) [month 30]
D2.4 : Ensemble diagnostics report and documentation (MO 30 pm) [month 42]

           Uncertainties in Regional Reanalyses - Final Report from the Met Office       
D2.5 : Report of results and datasets of two physics HARMONIE runs for spread estimation (SMHI 10 pm, MF 2
pm) [month 12]
D2.6 : Preliminary report of the first period of the RA (SMHI 36 pm) [month 30]
D2.7 : HARMONIE reanalysis report of results and dataset (SMHI 25 pm) [month 45]
D2.8 : MESCAN reanalysis dataset and report 1961-present (MF 40 pm) [month 45]
D2.9 : Ensemble surface reanalysis report (MF 10 pm) [month 30]
D2.10 : UERRA-MESA-CL 30-year European cloud fraction dataset and report (SMHI 7 pm) [month 24]
D2.11 : Probabilistic observations will be generated for Kalman Filter ensemble DA and a report will be written
(UB 10 pm) [month 15]. See the Report.
D2.12 : The KF ensemble reanalysis (KFENDA) system will be developed and with a report demonstrating
reanalysis uncertainty capability (UB 20 pm) [month 21]
D2.13 : KFENDA ensemble diagnostics report and documentation (UB 15 pm) [month 45]
D2.14 : RA uncertainty evaluation: EVDA/HARMONIE/KFENDA uncertainty evaluation report (SMHI 4 pm, MO 4
pm, DWD 3 pm, UB 3 pm) [month 45]

Attachments
201503270931 UERRA D v .pdf [454.61Kb]
Uploaded Friday, 27 March 2015 by Per Unden
UB D N .pdf [839.46Kb]
Uploaded Tuesday, 29 September 2015 by Per Unden
D MO corrected .pdf [3.06Mb]
Uploaded Friday, 13 November 2015 by Per Unden
UERRA deliverable D Results of year run two physics.pdf [6.38Mb]
Uploaded Tuesday, 16 February 2016 by Per Unden
D .pdf [880.25Kb]
Uploaded Tuesday, 12 April 2016 by Per Unden
UERRA deliverable D MESCAN cloud analysisPU.pdf [586.03Kb]
Uploaded Thursday, 03 November 2016 by Per Unden
deliverable pt v corrected.pdf [13.44Mb]
Uploaded Tuesday, 03 January 2017 by Per Unden
UERRA D Ensemble surface MESCAN comb.pdf [11.55Mb]
Uploaded Tuesday, 20 June 2017 by Per Unden
deliverable pt v .pdf [25.86Mb]
Uploaded Thursday, 29 June 2017 by Per Unden
Deliverable Final.pdf [18.81Mb]
Uploaded Wednesday, 01 November 2017 by Per Unden
UERRA deliverable D HARMONIE reanalysis report of results and dataset corr.pdf [5.52Mb]
Uploaded Tuesday, 07 November 2017 by Per Unden
UERRA deliverable D UB.pdf [2.15Mb]
Uploaded Monday, 08 January 2018 by Per Unden
MO FinalReport.pdf [27.88Mb]
Uploaded Monday, 08 January 2018 by Per Unden
UERRA D MESCAN y.pdf [9.17Mb]
Uploaded Tuesday, 23 January 2018 by Per Unden